久久久久人妻啪啪一区二区-久久久久人妻一区二区三区-久久久久人妻一区精品-久久久久人妻一区精品色-久久久久人妻一区精品色欧美-久久久久人妻一区精品性色av

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

久久精品国产69国产精品亚洲 | 国产成人亚洲精品无码av大片 | 少妇系列之白嫩人妻 | 亚洲h在线播放在线观看h | 中文字幕va一区二区三区 | 亚洲av成人噜噜无码网站 | 国产一区二区三区日韩精品 | 99xxoo视频在线永久免费观看 | 人妻聚色窝窝人体www一区 | 亚洲av无码成h在线观看 | 后进式无遮挡啪啪摇乳动态图 | 三年片在线观看免费大全电影 | 好吊色欧美一区二区三区视频 | 精品久久久久久久久中文字幕 | 免费观看亚洲视频 | 成人午夜国产福到在线 | 吃奶揉捏奶头高潮视频在线观看 | 日韩精品人成在线播放 | 国产精品毛片无遮挡高清 | 亚洲啪av永久无码精品放毛片 | 国产精品欧美视频另类专区 | 日本高清视频www | 久久亚洲中文字幕无码 | 国产精品久久久久久影视 | 国产ww久久久久久久久久 | 五月av综合av国产av | 久久人人爽人人爽人人av东京热 | 国产成人无码免费视频在线 | 亚洲av综合色一区二区三区 | 亚洲va欧美va天堂v国产综合 | 久久久久国产精品嫩草影院 | 中国妇女做爰视频 | 亚洲欧洲专线一区 | 国产精品久久久精品视频 | 久热国产vs视频在线观看 | 亚洲av永久无码精品漫画 | 国产成人无码一二三区视频 | 孩交精品xxxx视频视频 | 久久久久国产精品免费免费搜索 | 人妻体内射精一区二区三四 | 亚洲精品拍拍央视网出文 |