久久久久人妻啪啪一区二区-久久久久人妻一区二区三区-久久久久人妻一区精品-久久久久人妻一区精品色-久久久久人妻一区精品色欧美-久久久久人妻一区精品性色av

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

熟妇高潮喷沈阳45熟妇高潮喷 | 夜夜高潮夜夜爽国产伦精品 | 国产亚洲精品精华液 | 国产成人亚洲综合无码精品 | 爱爱视频天天看 | 国产成人精品福利色多多 | 国产一区二区三区四区五区加勒比 | 精品久久久久久综合网 | 精品国产免费人成高清 | 成年免费a级毛片免费看 | 韩国xxxx色视频在线观看 | 亚洲熟妇自偷自拍另欧美 | 免费av片在线观看网址 | 久久免费的精品国产v∧ | 欧洲av无码放荡人妇网站 | 亚洲av无码一区二区乱孑伦as | 丰满少妇人妻无码 | 国产精品视频无圣光一区 | 亚洲欧美精品aaaaaa片 | 国产精品免费观看久久 | 久久精品国产亚洲av蜜臀 | 亚洲精品无码国产 | 少妇愉情理伦片丰满丰满午夜 | 欧美s码亚洲码精品m码 | 精品国产一区二区三区成人 | 久久久久亚洲av无码专区首jn | 中字幕人妻一区二区三区 | 放荡的美妇在线播放 | 国产免费内射又粗又爽密桃视频 | 妺妺窝人体色777777 | 国产视频二区在线观看 | 18禁无遮拦无码国产在线播放 | 波多野结衣免费观看视频 | 四虎影院在线观看 | 亚洲熟女乱色一区二区三区 | 熟女少妇内射日韩亚洲 | 大又大又粗又硬又爽少妇毛片 | 国产欧美日韩精品在线 | 亚洲精品一区二区三区四区五区 | 国产亚洲精品美女久久久久 | 国产一区二区三区久久精品 |