久久久久人妻啪啪一区二区-久久久久人妻一区二区三区-久久久久人妻一区精品-久久久久人妻一区精品色-久久久久人妻一区精品色欧美-久久久久人妻一区精品性色av

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

美女黄在线观看 | 1000部精品久久久久久久久 | a级特黄毛片免费观看 | 精品人妻大屁股白浆无码 | 亚洲欧美中文字幕5发布 | 国产亚洲精品成人一区看片 | 国产精品亚洲精品日韩已方 | 免费无码高潮流白浆视频 | 亚洲人成网网址在线看 | 四虎影视免费观看高清视频 | 久久久久亚洲av成人无码电影 | 亚洲区小说区图片区qvod | 国产精品久久久久9999 | 又湿又紧又大又爽a视频国产 | 1级a的观看视频 | 国产欧美一区二区精品久久久 | 国产无人区码一码二码三mba | 国产精品无码av在线播放 | 亚洲风情亚aⅴ在线发布 | 国产人做人爱视频精品 | 欧美最猛黑人xxxx黑人猛交 | 性色av一二三天美传媒 | 欧美性猛交99久久久久99按摩 | 波多野结衣av无码久久一区 | 免费观看的毛片手机视频 | 国产在线永久视频 | 亚洲午夜精品久久久久久浪潮 | 体验区试看120秒啪啪免费 | 久久久久久久女国产乱让韩 | 国产精品久久久久久福利 | 免费a级毛片在线播放不收费 | 亚洲熟妇av一区二区三区宅男 | 熟妇高潮精品一区二区三区 | 日韩av在线观看免费 | 久久免费视频一区 | 免费国精产品wnw2544 | 少妇一晚三次一区二区三区 | 精品人妻久久久久久888 | 无码人妻h动漫中文字幕 | 人妻少妇精品中文字幕av蜜桃 | 99久久婷婷国产综合亚洲 |